Gold 360GOLD 360 · INSURANCE & INVESTMENTS
GOLD 360 · Insurance for building and renovation projects.

Insurance for building and renovation projects.

Review contract works, third-party and employers’ liability before work begins.

Call the office · 077-4850010
Zviki Gold

Building or renovating creates risks for the works, existing property, neighbours and people on site. Gold 360 helps homeowners and contractors discuss a project-specific insurance arrangement rather than relying on ordinary home insurance alone.

01

Arrange cover before the start

Contact the office during planning, before demolition, excavation or construction. Confirm the insurer has accepted the project and cover is effective before work begins. Insurance does not retrospectively cover a loss that has already happened.

02

The works and materials

Review cover for the declared works and materials against insured physical damage. Check project value, theft and security conditions, natural events, debris removal and exclusions.

03

Third-party liability

Discuss injury to others and damage to neighbours, shared property or infrastructure. Agree a suitable limit and ask about underground utilities, vibration, weakening of support and cross-liability wording.

04

Employers’ liability

Review liability involving workers and the role of each contractor or subcontractor. Confirm the insured parties, workforce, limits and conditions. Insurance arrangements do not replace legal or site-safety duties.

05

Existing property and extensions

Tell the insurer about the building being worked on and nearby property. Defective design or workmanship, maintenance periods and other extensions require specific review and written agreement.

06

Check the contractor’s insurance

Ask for current insurance evidence and check its period, activities, limits and whether you are included as an insured where needed. Do not assume a contractor’s policy automatically protects the homeowner.

07

Special work and site conditions

Disclose structural alterations, excavation, work on foundations, additions and unusual engineering work. Check permits, hot-work precautions, site security and the insurer’s special requirements.

08

Changes, delays and claims

Agree the project dates and notify Gold 360 before the policy expires if work is delayed. Report changes in scope or value and ask about any maintenance period. Keep records and follow the policy’s claims-reporting duties.

Cover is subject to insurer acceptance, policy limits, deductibles and exclusions. No complete protection or claim payment is guaranteed. Confirm the exact insured parties, legal responsibilities, start and end dates, and any extension before relying on cover.

A plan built around you.

Speak with Zviki about your needs and the next steps. Service in English and Arabic may be limited, please call to confirm.

Contact

The information is also provided in this language. Errors may exist on the site. The terms of the policy issued in Hebrew are binding.